We left off on 4/19 with the "Big Dig". This was so fascinating to see. Next step was for the pool supervisor to come check things out. He measured the pool from every angle possible and decided that it was 3" too deep. That's inches folks, but it wouldn't do. You see, the plumbing guys would lay all the pipes at the depth specified on the plans and the rebar people would do the same and they would all be floating way up in the air.
The city inspector wouldn't sign off on that, so back came the "dig" guys to fix it.
4/25 - They brought in a truck with some dirt and all the equipment again.
While one guy brought the dirt around to the back -
the guy with the backhoe scooped it up and put it in the pool.
They shoveled and tamped dirt all over and measured -
and measured again -
and again. Finally it was decided it was perfect.
Just as soon as these guys finished, the plumbers came rolling in with tons of pipes and fittings. They immediately started digging channels for their pipes.
One guy took the plans and went around spraying orange dots everywhere one of the pop-ups for the In-floor Cleaning System and the drain were going to be.
In no time at all they had pipes running all over the place.
You can see all the pop-ups capped off all over the bottom of the pool and on the bench and steps.
This is the main drain.
Pipes hooked up to the sk...